St. Bernard ParishBuilding & floodplain permits

Building and Floodplain Permits in St. Bernard Parish

7 cited sources · How we verify

Verify before you act. Rules, fees, programs and contacts change. This is general information, not legal, engineering, surveying or insurance advice. Confirm with the agency linked in each section. Full disclaimer.
On this page
  1. Where to apply
  2. What the posted checklists require
  3. Work near levees
  4. Who to contact (official)

The short answer

  1. Start with Community Development. Apply online at MyPermitNow or use the checklists posted on the Community Development page.
  2. Look up your flood zone first. See flood zones in St. Bernard Parish.
  3. Expect elevation documents on new houses, house-lifting projects, and some additions. See elevation certificates.
  4. If you will disturb the ground near a levee, ask whether you also need a Lake Borgne Basin Levee District permit.

Where to apply

The Department of Community Development says it protects lives and safety through adoption, implementation and enforcement of building, electrical, mechanical and plumbing codes. It posts an Apply Online – Pay Online link to MyPermitNow and a set of application packets for building, electrical, gas, mechanical, plumbing, demolition, manufactured homes, new residential construction, residential additions, renovations and elevation construction.

Office: 8201 W. Judge Perez Drive, Chalmette, LA 70043 · (504) 278-4200 · Monday–Friday, 8:00 a.m.–4:30 p.m. Construction checklists and the inspections line on those forms use (504) 278-4310.

A building-permit fee schedule is posted on the same page. Read the current PDF, or ask the office; we are not copying amounts that may change.

What the posted checklists require

Use the Parish’s current PDF for the full list. Highlights from the packets we reviewed:

New residential construction. Among other items, the checklist asks for a completed application, recorded titles, compliance with state contractor-licensing laws (or a homeowner exemption affidavit), two sets of dated, site-specific plans stamped by a Louisiana-registered architect or engineer, a property survey, and an original elevation benchmark prepared by a Louisiana-licensed surveyor. Foundation plans that use subsurface pilings or Kelly/post-tension slabs must be stamped by a Louisiana-registered architect or civil engineer. In areas with private sewerage, a preliminary letter from the State Health Department is required (the form lists (504) 278-7410). The form also warns that, depending on location, pilings may be required.

Elevation construction (lifting a house). The checklist asks for an application, recorded titles, compliance with state contractor-licensing laws, proof of riggers insurance, listed subcontractors, two sets of site-specific plans (including the method of lifting and anchorage to piers), and a letter stating that electric, gas and water have been disconnected. Utilities must be disconnected before elevation work begins. Electrical, plumbing, gas and mechanical work must be filed by St. Bernard Parish-licensed tradespeople and inspected. An original elevation certificate is due after piers are set and before the structure is lowered; an original finished certificate is due before the final building inspection is scheduled. A Certificate of Occupancy is issued after all final inspections.

Residential additions and accessory structures. Requirements vary by size (the checklist uses a 500-square-foot threshold) and by whether the site is in a “piling required” area. The checklist says additions in “A” or “V” flood zones may require FEMA elevation certification, and that State Health Department approval may be required in areas with private sewerage.

The new-construction, additions and elevation packets all say work must comply with the St. Bernard Parish Code of Ordinances, the comprehensive zoning ordinance, and the Louisiana Uniform Building Code.

Work near levees

The new-residential and additions checklists say that anyone who intends to do work that may change the subsurface within 1,500 feet of the Lake Borgne Basin Levee District Mississippi River flood-control structure, or within 300 feet of the toe of all hurricane-protection structures, must apply for a permit from the Lake Borgne Basin Levee District. The forms list (504) 682-5941 and [email protected]. The Community Development page also links a levee-district permit portal.

Who to contact (official)

Question Who Contact
Building, elevation or trade permits St. Bernard Parish Community Development MyPermitNow · (504) 278-4200 · (504) 278-4310 · 8201 W. Judge Perez Dr, Chalmette
Flood zone for my address Same department / building official See flood zones
Work near a levee Lake Borgne Basin Levee District (504) 682-5941 · [email protected] · permits.floodauthority.org

For wind-mitigation inspections or FORTIFIED roof programs, see The Wind File rather than this site. For grants and ICC, see Louisiana elevation grants and ICC.

See also our Louisiana flood insurance guides.

Frequently asked questions

How do I apply for a permit?

The Department of Community Development says you can apply and pay online through MyPermitNow (mypermitnow.org). The department is at 8201 W. Judge Perez Drive, Chalmette, LA 70043. The Community Development page lists (504) 278-4200 and hours of Monday–Friday, 8:00 a.m.–4:30 p.m. Construction checklists list (504) 278-4310 for inspections.

What elevation documents are required for a new house or an addition?

The new-residential-construction checklist requires an original elevation benchmark prepared by a Louisiana-licensed surveyor. The additions checklist says additions in “A” or “V” flood zones may require FEMA elevation certification. Confirm the current list with the office; checklists are posted on the Community Development page.

When do I also need a levee-district permit?

The Parish’s new-residential and additions checklists say that anyone who intends to do work that may change the subsurface within 1,500 feet of the Lake Borgne Basin Levee District Mississippi River flood-control structure, or within 300 feet of the toe of all hurricane-protection structures, must apply for a permit from the Lake Borgne Basin Levee District. The checklists list (504) 682-5941 and [email protected]. The Community Development page also links a Lake Borgne Levee District permit portal.

Sources

Official and primary sources used for this page. Pages move; if a link breaks, search the title on the publisher’s site.

  1. Community Development (St. Bernard Parish) — St. Bernard Parish Government
    Source for the online permit portal, posted application packets, address, main phone and hours.
  2. MyPermitNow customer portal — St. Bernard Parish Government (MyPermitNow)
    The “Apply Online – Pay Online” link on the official Community Development page.
  3. New Residential Construction Checklist (St. Bernard Parish Community Development) — St. Bernard Parish Government
  4. Elevation Permit Checklist (St. Bernard Parish Community Development) — St. Bernard Parish Government
  5. Residential Additions and Accessory Structures Checklist (St. Bernard Parish Community Development) — St. Bernard Parish Government
  6. Building Permit Fees (St. Bernard Parish) — St. Bernard Parish Government
    Fee schedule as posted by the Parish. We did not transcribe amounts here; read the current PDF or ask the office.
  7. Lake Borgne Levee District permit portal — Flood Protection Authority / Lake Borgne Basin Levee District
    Linked from the Parish Community Development page.