StatewideLetters of Map Change
Letters of Map Change in Louisiana: LOMA, LOMR, LOMR-F and CLOMR
On this page
The short answer
- A Letter of Map Change (LOMC) is FEMA’s formal decision about whether a property or area should be shown in a Special Flood Hazard Area, or whether the effective flood map should be revised.
- A LOMA is for natural ground (no fill). A LOMR-F is for ground raised by earthen fill. A LOMR officially revises the map, usually after physical changes. Conditional letters (CLOMA, CLOMR-F, CLOMR) comment on a proposed project and do not change the effective map.
- Apply through Online LOMC (or paper forms). In most cases you will need a licensed surveyor or engineer and an elevation certificate.
- FEMA does not charge a review fee for a LOMA. Other letter types have fees published on FEMA’s flood map-related fees page. Confirm that page before you pay. A surveyor’s fee is separate.
This process is FEMA’s nationwide process. It applies in Louisiana the same way it does elsewhere. Your parish floodplain office can help you understand your zone and may already have an elevation certificate on file, but FEMA issues the letter.
What these letters are
FEMA’s “Change Your Flood Zone Designation” page says that if you believe your property was incorrectly identified as a Special Flood Hazard Area (SFHA) by the National Flood Insurance Program, you may submit an application to FEMA for a formal determination of the property’s location and/or elevation relative to the SFHA. FEMA calls that a Letter of Map Change (LOMC) request. An SFHA, FEMA says, has a one percent or greater chance of flooding in any given year (the one-percent-annual-chance flood, or base flood).
After review, FEMA issues a determination document approving or denying the map change.
LOMA (Letter of Map Amendment)
FEMA describes a LOMA as a letter stating that an existing structure or parcel of land — that is on naturally high ground and has not been elevated by fill — would not be inundated by the base flood. Its LOMA process page says these cases are often “inadvertent inclusions”: small areas of natural ground at or above the Base Flood Elevation (BFE) that the flood map shows in the SFHA because of scale or topographic limits.
For a request involving one or more structures, FEMA says the lowest adjacent grade (the lowest ground touching the structure) must be at or above the BFE. For a request involving one or more lots, the lowest point on the lot(s) must be at or above the BFE. There is no FEMA review and processing fee for a LOMA.
LOMR-F (Letter of Map Revision Based on Fill)
A LOMR-F, FEMA says, is a letter stating that an existing structure or parcel of land has been elevated by earthen fill and would not be inundated by the base flood. It is similar to a LOMA, but it is based on fill rather than natural ground.
For structures, FEMA says the lowest adjacent grade must be at or above the BFE, and the participating community must also determine that the land and any existing or proposed structures to be removed from the SFHA are “reasonably safe from flooding.” For lots, both the lowest point on the lot and the lowest floor of the structure must be at or above the one-percent-annual-chance flood elevation. FEMA charges a fee to review a LOMR-F.
LOMR (Letter of Map Revision)
FEMA’s Online LOMC FAQ describes a LOMR as an official revision to an effective FIRM that may change flood insurance risk zones, floodplain and/or floodway boundary delineations, planimetric features, and/or the BFE. Unlike LOMAs and LOMR-Fs, the FAQ says, a LOMR usually results in reprinting a portion of a FIRM. These requests are typically used when physical changes affect flooding conditions, not as a simple “my house sits on a high spot” correction.
Conditional letters: CLOMA, CLOMR-F and CLOMR
These letters comment on a proposed structure or project. They do not revise or amend the effective FIRM.
- CLOMA: FEMA’s FAQ describes this as a letter stating that a proposed structure that is not to be elevated by fill (natural grade) would not be inundated by the base flood if built as proposed.
- CLOMR-F: a letter stating that a parcel of land or proposed structure that will be elevated by fill would not be inundated by the base flood if fill is placed, or the structure is built, as proposed.
- CLOMR: a letter stating that a proposed project that would, upon construction, affect the hydrologic or hydraulic characteristics of a flooding source and thus result in modification of the existing regulatory floodway, the effective BFE, or the SFHA.
The FAQ says a CLOMA, CLOMR-F or CLOMR does not remove the mandatory purchase of flood insurance; it provides comments on the proposed plan. After construction, a separate application with as-built information is needed to request a LOMA or LOMR-F (or, for a project that will revise the map, a LOMR). The FAQ also says NFIP regulations do not require a conditional letter for a proposed project, but to check with local community officials, because a locality may require one.
Elevation certificates and other data
FEMA’s LOMA and LOMR-F process page says that in most cases the applicant will need to hire a Licensed Land Surveyor or Registered Professional Engineer to prepare an Elevation Certificate, and that the requester is responsible for providing all information needed for the review, including elevation information certified by a licensed land surveyor or registered professional engineer.
Online LOMC, FEMA says, requires information about the property including location, legal description, and use of fill. Additional data may be required; a FEMA representative will notify the applicant.
An elevation certificate is not itself a map change. It is often the survey evidence FEMA uses to decide a LOMA or LOMR-F. If you already have one, check that it matches the building as it stands today and that the surveyed sections are signed and sealed. Our parish guides explain how to ask whether a certificate is already on file and how to hire a Louisiana-licensed surveyor (verify the license at LAPELS).
How to apply
You may file online or by paper forms.
- Online LOMC: fema.gov/online-lomc. FEMA’s FAQ says anyone — including communities, home or property owners, their representatives, and professional surveyors and engineers — may submit a request there. You can request an amendment or revision, upload supporting documents, pay any associated fees, and check status. The FAQ says the Online LOMC tool is an alternative to the MT-EZ, MT-1 and MT-2 paper forms. Amendment requests (LOMA, CLOMA, LOMR-F, CLOMR-F) use the MT-1 portion; revision requests (LOMR and CLOMR) use the MT-2 portion.
- Paper forms: FEMA’s change-your-flood-zone and LOMA/LOMR-F pages name MT-EZ (for a LOMA involving a single residential lot or structure), the MT-1 package (multiple lots or structures, and all LOMR-F requests), and MT-2 (LOMR and CLOMR). Those pages link the paper forms from Change Your Flood Zone Designation.
- eLOMA: licensed surveyors and engineers may submit simple LOMA applications through FEMA’s eLOMA tool. FEMA’s change-your-flood-zone page says registered users can generate a determination within minutes of submitting required information. The Online LOMC FAQ says a determination from Online LOMC is not received until after FEMA reviews the supporting documentation and receives any required payment.
FEMA’s LOMA and LOMR-F process page says that after it receives a complete application package (paper or Online LOMC), it will normally complete its review and issue its determination in 60 days. The same page lists a notice of submittal completeness within 30 days, and an amendment determination within 60 days of receipt of all required data. The Online LOMC FAQ, in one place, says an MT-1 determination is issued electronically within 60 days of receipt of all required data, and in comparing eLOMA with Online LOMC says an Online LOMC determination may take up to 90 days. Plan for the longer of those published figures, and check the status of your request.
For help, FEMA’s fee page points to the FEMA Map Information eXchange (FMIX). The Online LOMC FAQ lists 1-877-FEMA MAP (1-877-336-2627).
What FEMA says it charges
The figures below are from FEMA’s Flood Map-Related Fees page. That page states the schedule is effective for requests postmarked on or after February 20, 2015, and it shows a last-updated date of January 19, 2023. Confirm the live page before you pay. FEMA says that by submitting online, fees are reduced, that payment must be received before services are rendered, and that fees are non-refundable once FEMA begins its review.
For Online LOMC, the FAQ says payment is by credit card (Visa, MasterCard, Discover, American Express) or E-Check, and that E-Check payment requires approximately three business days to process (the Online LOMC help text also mentions about three to five business days).
Letter types homeowners most often use (FEMA’s published amounts):
| Request | Paper form fee | Online LOMC fee |
|---|---|---|
| Single-lot or single-structure LOMA | Free | Free |
| Multiple-lot or multiple-structure LOMA | Free | Free |
| Single-lot/single-structure CLOMA or CLOMR-F | $600 | $500 |
| Single-lot/single-structure LOMR-F | $525 | $425 |
| Single-lot/single-structure LOMR-F based on as-built information (CLOMR-F previously issued by FEMA) | $425 | $325 |
| Multiple-lot/multiple-structure CLOMA | $800 | $700 |
| Multiple-lot/multiple-structure CLOMR-F and LOMR-F | $900 | $800 |
| Multiple-lot/multiple-structure LOMR-F based on as-built information (CLOMR-F previously issued) | $800 | $700 |
FEMA’s same table also lists substantially higher fees for CLOMR and LOMR requests that require special technical review (for example, projects involving new hydrology, a bridge, culvert, channel, levee, or berm), and it lists some LOMR requests based solely on more detailed data as free. Read that table if you are seeking a LOMR or CLOMR. The page also describes fee exemptions in 44 C.F.R. § 72.5 (including requests for LOMAs) and a habitat-restoration exemption; we are not restating every exemption here.
A surveyor’s or engineer’s charge for an elevation certificate is not a FEMA fee.
If FEMA grants (or denies) the request
FEMA’s LOMA and LOMR-F process page says issuance of a LOMA or LOMR-F eliminates the federal flood insurance purchase requirement as a condition of federal or federally backed financing, but the mortgage lender retains the prerogative to require flood insurance as a condition of providing financing. The same page says a LOMA or LOMR-F does not mean the structure or lot is safe from all flooding — only that the risk is not as high as it is in the SFHA — and that more than 25 percent of flood claims are made by property owners located outside the SFHA. Premiums outside the SFHA, it says, are lower than premiums in the SFHA.
FEMA’s change-your-flood-zone page says that if FEMA grants the request, the property owner may send the determination document to their lender and request that the federal flood insurance requirement for the structure be removed. The Online LOMC FAQ describes a premium-refund path if the lender agrees to waive the requirement, provided no claim is pending or has been paid on the policy during the same policy year.
Keep flood insurance until your lender has agreed in writing, and talk with your agent about whether a lower-cost policy still makes sense. For how NFIP and private policies differ, see NFIP vs. private flood insurance in Louisiana.
Louisiana contacts
- FEMA Online LOMC: fema.gov/online-lomc
- FEMA Map Information eXchange: 1-877-336-2627
- Your parish floodplain office can often confirm your zone and whether an elevation certificate is already on file. Start with the flood-zone and elevation-certificate guides for Orleans, Jefferson, St. Tammany, Plaquemines, St. Bernard, Lafourche, Terrebonne or St. Charles Parish.
- Verify a Louisiana surveyor or engineer: LAPELS individual search
See also our Louisiana flood insurance guides.
Frequently asked questions
Is a LOMA request free?
FEMA’s flood map-related fee schedule says a single-lot or single-structure LOMA is free, whether you file on paper or through Online LOMC, and that multiple-lot or multiple-structure LOMAs are also free. FEMA charges fees for LOMR-F, conditional letters, and most LOMR/CLOMR requests. Confirm the current amounts on FEMA’s fee page before you apply. You may still have to pay a surveyor or engineer for an elevation certificate or other supporting data.
If FEMA issues a LOMA, can I drop flood insurance?
FEMA says issuance of a LOMA or LOMR-F eliminates the federal flood insurance purchase requirement as a condition of federal or federally backed financing, but that the mortgage lender may still require flood insurance as a condition of the loan. FEMA also says a LOMA or LOMR-F does not mean the structure or lot is safe from all flooding, and that more than 25 percent of flood claims are made by property owners outside the Special Flood Hazard Area. Conditional letters (CLOMA, CLOMR-F, CLOMR) do not remove the mandatory-purchase requirement.
Do I need an elevation certificate to apply?
In most cases, yes. FEMA’s LOMA and LOMR-F process page says the applicant will need to hire a licensed land surveyor or registered professional engineer to prepare an elevation certificate, and that the requester must provide elevation information certified by a licensed land surveyor or registered professional engineer. Start with our parish elevation-certificate guides if you need to find or order one.
How long does FEMA take?
FEMA’s LOMA and LOMR-F process page says that after it receives a complete application, it will normally complete its review and issue a determination in 60 days, and it lists a notice of submittal completeness within 30 days. FEMA’s Online LOMC FAQ also says that once an application and all necessary data are received, FEMA will notify the applicant of an MT-1 determination electronically within 60 days, and, in comparing tools, that an Online LOMC determination may take up to 90 days. Ask FEMA or check your Online LOMC status for the current case.
Sources
Official and primary sources used for this page. Pages move; if a link breaks, search the title on the publisher’s site.
- Change Your Flood Zone Designation — FEMA
Source for the LOMC request overview, LOMA and LOMR-F definitions, Online LOMC and eLOMA options, and the statement that a granted amendment or revision may allow the owner to ask a lender to remove the federal flood-insurance requirement. - Letter of Map Amendment & Letter of Map Revision-Based on Fill Process — FEMA
Source for inadvertent-inclusion and fill explanations, elevation-certificate requirement, 30- and 60-day timing, LOMA vs. LOMR-F determination requirements, insurance effects, and paper-form names (MT-EZ, MT-1). - Online LOMC Frequently Asked Questions — FEMA
Source for LOMC type definitions (including CLOMA, CLOMR-F, LOMR, and CLOMR), who may use Online LOMC, eLOMA vs. Online LOMC, MT-1 vs. MT-2, conditional-letter limits, payment methods, and the up-to-90-day Online LOMC timing note. - Online LOMC — FEMA
- Flood Map-Related Fees — FEMA
Source for the fee schedule. The page states the schedule is effective for requests postmarked on or after February 20, 2015, and shows a last-updated date of January 19, 2023. Confirm current fees on the live page.