Grants & funding
FEMA Hazard Mitigation Grant Program (HMGP): Elevation Money After a Declared Disaster
The Flood File is not affiliated with FEMA, the National Flood Insurance Program, or any government agency. This page is general information, not an application or an eligibility decision. Flood insurance basics: see our flood insurance section.
Status: depends on the disaster; UNCONFIRMED for 2026 storms
- Louisiana, Tropical Storm Arthur (DR-4927, declared June 30, 2026): GOHSEP’s September 2026 minutes say FEMA had addressed every parish request except HMGP for declared parishes. We found no later notice that HMGP was approved. Treat as pending.
- Texas (DR-4935, declared Sept. 1, 2026), Mississippi (DR-4930 and DR-4922), Florida (DR-4955, DR-4956, DR-4957): major disaster declarations exist; we could not confirm whether HMGP was authorized or whether residential elevations will be solicited. Ask your state.
- Alabama: FEMA’s Alabama page lists only emergency declarations in 2026. Baldwin County lists older HMGP applications (Hurricane Sally, DR-4563) as pending FEMA review.
Who qualifies
From FEMA’s property-owner guidance:
- Your home must be in a state with a Presidential disaster declaration, and your state and community must have approved hazard mitigation plans.
- In a Special Flood Hazard Area, your community must be an NFIP member in good standing.
- The project must be cost-effective, technically feasible, and environmentally sound, and approved by FEMA.
- You cannot apply directly. Your local government develops and submits the application.
FEMA lists “elevating structures above known flood levels” and “reconstructing damaged dwellings on elevated foundations” among eligible HMGP projects.
Amounts and cost share
FEMA says federal funding generally pays up to 75%, with the remaining 25% from non-federal sources. Each disaster’s HMGP pot is a share of the federal disaster spending, so how much is available, and whether elevations make the cut, depends on the state’s priorities. FEMA notes some communities use ICC payments assigned by policyholders toward the match.
Step by step
- After a declared disaster, call your parish or county and ask to be included if HMGP opens. FEMA tells owners to request that their property be included in the community’s application.
- Watch local channels. FEMA says opportunities are announced on local government websites, local media, and public meetings.
- Fill out the local interest packet. Baldwin County’s is a good example: mitigation interest survey, notice of voluntary interest, owner questionnaire, declaration and release, home elevation checklist, permission to enter, and privacy release.
- Waiting point 1: your community writes the scope, schedule, and cost estimate and submits to the state, which ranks projects and forwards them to FEMA. States have 15 months from declaration to submit (extensions possible).
- Waiting point 2: FEMA reviews cost-effectiveness, feasibility, and environmental and historic-preservation compliance.
- Approval: FEMA notifies the state, which notifies your community. Only then may work start.
- Construction: your community may manage the project or let you manage parts of it. Keep detailed payment records.
- Reimbursement and closeout: FEMA says it reimburses only after approved work is complete. Expect a final inspection and elevation certificate, and, in an SFHA, flood insurance for the life of the structure.
Documents checklist
See the printable list in the checker. Core items: proof of ownership, interest and release forms, elevation certificate, photos of damage, records of what repairs were already done, and later, contracts, invoices, and proof of payment.
Related: all programs · FMA · Swift Current · contractor guides
Frequently asked questions
Do I need flood insurance for HMGP?
Not always to start. Florida’s Elevate Florida FAQ says flood insurance is not required to participate in HMGP initially, but if the property is in a Special Flood Hazard Area when the project is complete, keeping flood insurance becomes a grant condition for the life of the structure. Ask your local sponsor.
How long is an HMGP window open?
A 2024 FEMA rule gives states 15 months from the disaster declaration to submit HMGP applications, with possible extensions. Your parish or county will have an earlier internal deadline.
I did repairs right after the storm. Will that disqualify me?
FEMA says work done before FEMA’s review and approval will not be reimbursed, except basic repair work necessary to make the home habitable. Tell your sponsor exactly what was done and when.
Sources
Official and primary sources used for this page. Pages move; if a link breaks, search the title on the publisher’s site.
- Hazard Mitigation Grant Program (HMGP) — FEMA
- Property Owners and the Hazard Mitigation Grant Program — FEMA
Source for eligibility conditions, the 75% share, the application path, work-before-approval, and reimbursement. - Hazard Mitigation Grant Program Application Period Extension (89 FR 66241, Aug. 15, 2024) — Federal Register (FEMA rule)
Background on the application period; the rule extended it to 15 months after declaration. - Regional Directors Meeting Minutes, September 2026 — GOHSEP
States the DR-4927 request for HMGP for declared parishes was still pending with FEMA. - Louisiana Tropical Storm Arthur (DR-4927) — FEMA
Funding table lists Individual and Public Assistance only. - Texas declared disasters — FEMA
DR-4935-TX, declared Sept. 1, 2026. - Mississippi declared disasters — FEMA
DR-4930-MS and DR-4922-MS. - Alabama declared disasters — FEMA
2026 entries are emergency declarations only. - Florida declared disasters — FEMA
DR-4955-FL, DR-4956-FL, and DR-4957-FL. - Elevate Florida General FAQs — Florida Division of Emergency Management
- Hazard Mitigation Assistance (Baldwin County EMA) — Baldwin County Commission, Alabama